Engineering guides, product updates, and case studies from our team.
Prose now calculates attached canopy wind loads to ASCE 7-16 Section 30.11 and ASCE 7-22 Section 30.9, with both figure sets, the hc/he bands, and the 16 psf minimum in a cited report.
ASCE 7-22 changed Chapters 26–28 for MWFRS: Kd relocation, Kz recalibration, two deleted methods, and a new elevated-buildings provision.
ASCE 7-22 changed ground snow maps, thermal factor Ct, drift loads with W2, and LRFD snow factors. Here is what shifted from 7-16.
Step-by-step rain load calculation per ASCE 7-22, 7-16, and 7-10 — static head, hydraulic head, ponding head, and secondary drainage system requirements across editions.